An icon showing people

Who

Dundee University
An icon showing a product box

What

INSUduct 63
An icon showing a map pin

Where

Refurbished Boiler Room
An icon showing a calendar

When

2009
An icon showing a magnifying glass

At a glance

  • Ideal solution for installing large-bore water services where internal access is restricted

  • Thermal protection for water pipes installed externally

  • Allows installation without shutting down existing plant rooms

  • Fast, clean and minimally disruptive for ongoing university operations

  • Proven solution used in other large-scale refurbishment projects (MOD, HMP, Lancashire Police HQ)

Tricky Water Supply Install with INSUduct 63™ at Dundee University

Installing a new large-bore water pipe in a refurbished boiler room can be challenging, especially when plant rooms cannot be taken offline. At Dundee University, engineers used INSUduct 63™ to route the new water service externally, entering the building at high level. The result? A fully protected, compliant and disruption-free installation that kept operations running smoothly.

The Problem

The refurbished boiler rooms at Dundee University needed a new 63mm OD water supply pipe. Traditionally, this would have required running the pipe through existing plant rooms, none of which could be turned off for installation. The challenge was to deliver a reliable water service without disrupting ongoing operations or risking damage to existing equipment.

Products used

INSUduct 63

INSUduct 63™

FIND OUT more

The Solution

Using INSUduct 63™, engineers were able to route the new water service along an exterior wall and enter the building at high level. This innovative approach avoided the need to access the operational plant rooms and provided full thermal protection for the pipework.

INSUduct 63 is the only product on the market capable of providing this level of thermal protection for water services installed externally. Its versatility has made it the preferred solution for similar projects, including Lancashire Police Headquarters and refurbishment works at MOD and HMP locations.

The Result

A fully installed, thermally protected water supply, completed quickly, efficiently, and with minimal disruption to university operations. The project demonstrates how smart design and the right products can overcome even the most challenging installation constraints.

Back

Where to buy

Looking to purchase Groundbreaker products? Whether you're a developer, contractor or supplier, we’ve made it simple to find the right solutions - right where you need them.